PITCH PINE WOOD GRAINING WITH DONAL QUIGLEY

Donal Quigley is an Irish painter and decorator who has a passion for wood graining and tells us about his process and techniques for reproducing pitch pine.

ABOUT DONAL

received_1169987749695655

Donal Quigley is a third generation painter and decorator from County Kilkenny in Ireland.  His apprenticeship was served under the guidance of his father in the eighties and after completing his training, Donal founded his own decorating business in 1992.

Besides the standard painting and decorating work, Donal found himself working in more and more specialized areas such as hand painted signs, gilded hand-carved signs and sandblasted glass signs as well as different wall finishes.

In 2014, Donal studied at the SWR Decart Studio in Dublin under the tutelage of Michel Nadai, the respected French decorative painting artist.

For the past five years, Donal has found himself focusing on wall panelling systems due to their growing popularity in Ireland.

WHAT IS PITCH PINE?

pitch-pine-floorboards

Indigenous to the United States and the eastern seaboard in particular, the Pitch Pine can grow upwards of 60 feet and has a lifespan of some 200 years.  A hardy species, not even fire or severe trauma can destroy it.

The reason for its centuries old popularity is due to its high resin content.  Indeed, as well as being used for woodwork, the pitch pine is a source for turpentine and tar, otherwise known as pitch!

These days it has a less glamorous purpose, being used for fuel, pulping and making crates.  In the past however, it was used to create anything from railroads and wooden ships to church pews, panels and flooring.

pitch-pine-church-pew-256357

Pitch pine is not a strong wood and has a rough texture to the grain, however the high resin content leaves it resistant to decay, hence its popularity.  The resinous nature of the wood has its down side however, as it makes it difficult to machine and sand.

Previously pitch pine was sought after due to the vibrant shades and figuring of the grain, however since the boom of railroads and mass planting and forced early foresting of the trees, the quality of the grain began to suffer which is why it is currently used for less elegant tasks.

As a result, the only way to obtain finer specimens is through reclamation, which means in turn that demand has outweighed supply causing a worldwide shortage and rising prices.

This has led to a resurgence in demand for painted reproductions to match already present architectural elements.

DONAL’S PROCESS

Materials and Tools

Colours Used: Raw Sienna, Burnt Sienna, Burnt Umber

Water Based System:

Base colour B.S. 06.C.33.

Johnstone’s pine woodstain.  

Floetrol paint conditioner

Tint with powder colour.  

Work into a paste and thin as required with water.

Tools required

tools

To start brush on a wash  of the above and obliterate all brush marks to leave a translucent effect.   Allow to dry.

  1. Use a S.1210L. Duck Signwriter’s brush to pencil in figure.

1

  1. Begin to form the figure.

2

  1. Join the sap and continue up.

3

  1. Main figure is now formed.  It is important to soften after each line is drawn to avoid smudging into the next line.

4

  1. Now using some burlap begin to do the side grain.

5

  1. Glaze the other side.

6

  1. Then burlap to form tight side grain effect.

7

  1. Finished central panel.

8

  1. Next tape off top rail.

9

  1. Pencil in figure and soften as you go.

10

  1. Finish rail.

11

  1. Repeat process on lower rail.

12

  1. Last two styles to do.  These can be plain straight grain if you prefer.

13

  1. Same process, pencil in grain and burlap side.

14

  1. And same on other side.

15

  1. Allow to dry.

16

  1. Add a thin line of colour to emphasise the joints.

17

  1. Overglaze with same colour, adding some Vandyke brown to create      highlights and moirés.  Then badger lightly.

18

  1. Panel overglazed.

19

  1. Finished panel varnished.

20

For more examples of his work and to contact Donal, please click the following Facebook link: Donal Quigley Painting and Decorating

 

 

 

 

Methods and Techniques for the Ecclesiastical Restoration of a Statue of St. Joseph

ECC

Raimonds Karveckis has completed advanced gilding at FlorenceArt studio of decorative arts in Florence, Italy and studied restoration techniques under the tutelage of Laurent Hissier, former restoration specialist at the Palace of Versailles in France and now a freelance master craftsman. Originally from Latvia, Raimonds has been based in Ballina, Co.Tipperary, Ireland since 2001, where he is well known in the area for his artistic abilities and he is the owner of Ecclesiastical Restoration Workshop.

http://ecclesiastical-restoration.ie/

ECCLESIASTICAL RESTORATIONS WORKSHOP

Using restoration techniques and materials sympathetic to the period in which the objects were made, the creative team in the workshop can undertake the repair and restoration of religious artefacts.

This includes specialist paint effects on walls such as frescos and gilding on dados and plaster trims as well as repairs to paintings and frames, furniture, metal ware, gilded objects, candelabras and other furnishings.

Of particular interest is the restoration of Church Statuary which includes nativity sets, statues, saints, altars and more.

Ecclesiastical Restorations is also an associate member of a network of antique restorers who work throughout Europe and America on government and privately backed restoration projects.

EXTENSIVE RESTORATION OF A STATUE OF ST. JOSEPH – METHODS AND TECHNIQUES

A local priest found this statue in a shed, where it had been neglected for 20 years and brought it to Raimonds for repair and restoration. Raimonds immediately saw the quality of the statue, only a high quality of plaster and workmanship could have resulted in its survival in such conditions. He puts the age of the piece at between 100 and 150 years old.

pic1

The biggest repair job was to reattach the head. Raimonds first had to gain access into the statue, this was accomplished by cutting a section out from the rear, and he then made a wire armature and attached this first to the head and then the body after seating the head correctly with a two part epoxy resin.

pic2

While working inside the statue, the chest area was found to be extremely thin. This was reinforced with plaster of paris and the gaps around the repaired head were filled out, taping the outside to hold the plaster in place.

pic3

The panel was then replaced in the back of the statue and plastered in.

pic4

The statue was missing a hand, so Raimonds commissioned a local sculptor to create a mold, from which a replacement was cast and attached using an armature and epoxy. The repair was again made good with plaster of paris.  The flower had a replacement stem made of plaster over a wire armature attached and was fixed to the statue.

pic5

Cleaning, Painting and Gilding

After cleaning the statue with a specially made solution it was discovered that the paint on both faces could be saved. The rest of the statue was carefully sanded and hoovered before priming in a white basecoat.

pic6

The paintwork on the heads and faces was touched up with casein paint as this was the paint most likely to have been used originally, unfortunately at the time casein paint proved hard to source so Raimonds used chalk paints on the main body of the statue. As the statue was to be placed up high on the wall of the church it was not necessary to seal the chalk paint.

pic7

Raimonds moved onto the gold leaf ornamentation of the statues, a process that was to take a month to complete. The designs were laboriously hand painted in yellow ochre casein paint before being sized and gilded, a testament to the patience of the craftsman!

pic8

To finish, a wooden base was commissioned from a local carpenter and this was finished in an old master technique by Raimonds. The wood was sealed with hot rabbit skin glue, then 12 coats of gesso were applied and carefully sanded before painting with casein paint, distressing, hand painting the ornament and sealing with shellac.  The base was then attached to the statue with evo bond universal pva.

pic9

From start to finish the entire restoration process took a total of three months. The statue can now be seen on display in Our Lady & St. Lua church, Ballina, Co. Tipperary, Ireland.

fin

Clock Dial Restoration – St Firmin’s Church, North Crawley

David R Agnew is a respected Craftsman Decorator from Newport Pagnell in the UK and in this article he gives a step by step account of the methods and techniques involved in the complicated and delicate restoration process of the Clock Dial at St. Firmin’s Church in North Crawley.

Clock1

Clock Dial prior to restoration

 

A diary slice of the Clock Dial restoration.
David R Agnew LCGI
Craftsman Decorator
Newport Pagnell

Just started this today, should have been six weeks ago, but have been waiting for
the faculty from the diocese to arrive.

So…arrived this morning to instruct the scaffolders’ of my requirements. So thought,
while I was waiting for them to erect it, I would start having a poke around, taking
pictures & documenting the job.
Clock 2
Scaffold being erected

The job consists of three items, the clock dial, the leaded window underneath the
dial & the gilding of the weathercock -which has already been completed.

Clock 3

So, poking around I went into the church & found the door leading to the tower, as
for me, this would be the route to access the scaffold. Up a winding stone staircase
which is only 2′ width & terminating at the clock room, where there is a door in the
far corner which takes you to the back of the dial.
Clock 4

clock5
The movement is ‘J Bennett of 65 Cheapside London’ I believe this was installed in
the Victorian era.

6

First thing I notice is that where I need to work, it is completely filthy, covered in cobwebs and
years of dust etc, this was going to be my first job -clean up. I can’t stand working in a mess
before the work even starts! I do this, because I want to get absorbed in my environment,
working in old buildings takes on a different pace for me & it helps you to take in & notice
tiny details when not rushed or jumping straight in.
However, I knew that the first day would be about thinking the job through and formulating the
work plan in my head -time spent thinking is never wasted.
7
I decided to investigate the window, and discovered that I could take this out from the inside,
fortunately, it is in it’s own wooden frame which is in pretty good condition, so will refurbish
the frame. The leaded window itself has not faired well, and I have decided that I will just make
a new one, the lead cames are very thin and with so much glass missing, it isn’t really
economical to repair. The window is approximately 120 years old and I would guess it was
installed the same time as the original clock movement and dial etc. The iron tie bars, which
are there to help support the window, are unusual to me, they are thin at one end. This is
because the thin end has been driven onto the frame and then secured with a clout nail in the
flange at the other side. All the ones I have seen in the past have just been the same
thickness and built into the frame, or a fixing flange at each end -so, just a little detail I picked
up on. The whole window, will be taken back to the workshop, where I will take a rubbing and
make a new one based on that.

8
After doing the rubbing I take the old panel apart, soak all the reusable glass in ‘Krud Kutter’
–a sugar soap type cleaner. I have been fortunate in the past, as I have always saved old
glass from when I have had to do repairs on box windows and the like, so I have plenty of
spare bits to make this window complete with all old crown or muff glass.
9
Second morning, I am still missing the tarps to keep the weather out, so the
scaffolders’ have to come back for that. Anyway, thought I would have a close look
at the dial. Firstly, I wanted to establish what material it was,and yes, it did turn out
to be copper. The previous paint job was very rough, not to our usual painting
standards. Although the gilding seems fairly bright & in reasonable condition, the last
job is not entirely honest, as you can make out, that who ever did it, didn’t paint the
whole dial with a system, then sign write and gild in the proper manner, because you
can see where the numerals have been gone round and where it is grey in between over
all, is not a very tidy job. When it is viewed whilst 40 feet in the air and from a
distance, it isn’t noticeable.

10
Nevertheless, I proceeded to take measurements of the numerals and make notes. I
then covered the whole dial with drafting film and took accurate tracings of the existing
layout, when I get the latter back to the workshop, I will lay it out on the drawing
board to make the final adjustments to accuracy and then prick it to convert the draft
into the working drawing for later transfer.
With all the note taking done, I then started to prepare the copper dial. I abraded
the existing coating with 60 grit, using mechanical sanding with extraction, because
of the dangers with possible lead paint being present. The whole Is in very sound
condition, so washed down, after sanding with ‘Krud Kutter’ and then applied a first
coat of Rustoleum Alkythane, a satin finish industrial coating which weathers by
erosion. Colour RAL 5009

11

Now I turn my attention to the dial back boarding. Most of the moulding has
decayed, so I need to sort some new out. The existing mould consists of three parts,
I didn’t think it was particularly special, but the fact that it is made up from three
different components lends itself to fail on the moisture ingress front. After removing
the lower five sections around the base board, It was quickly becoming apparent,
that the base boarding itself had decayed in several places. This lead me to ask
questions about the integrity of it fixings. Should I just patch up, with new hardwood
mouldings and just screw the copper dial back on? No was the answer. The effort for
the scaffold, the cost of doing all the signwriting, painting and gilding would just be
wasted.
A date on the board was 1957 signed ‘EB’ the style of mouldings and the whole feel of
this dial ties in with the date. We think ‘EB’ is a local builder called Eddie Brandon. I
felt nothing was going to be lost, or no architectural feature of any note would be
destroyed by deciding that this boarding had seen its life and if I was going to do
things with integrity, then I needed to make a new one. Thinking about it, this board
had served 60 years, so maybe the one before this, had lasted about the same, if it
was installed the same time as the movement. The copper dial itself certainly ties in
with the movement, as it bears the same maker’s name.

12
I would make a new one from English oak and do it in the same way as the last one two
layers, horizontal boards overlaid with vertical boards, each board
thickness15mm making a total of 30mm. I commission the local joinery shop to
machine up my requirements. In the meantime, I apply another coat of Alkythane to
the copper dial and head back to the workshop to make a start on the window.
Having had a phone call to say my oak was now machined up, I went to collect this and
start with earnest. Laying the boards out, I start to screw them together, using
stainless steel screws of course, as the tanning in oak will corrode steel ones. I first
make a square with the boards, then find the centre by marking diagonal. Using a
compass I mark out 1240mm, being the diameter of the dished copper dial. I can
now determine where to mark out the mouldings and cut the board to the octagonal
shape. Lovely to return back to the technical drawing days and summon the rules of
geometry, It’s been so long, I thought I’d forgotten!!!
13
There is a space between the back of the clock dial bottom and the top front of the
window beneath. This little board, takes up this space and the window splay. The other
one as you can see from the picture, is riddled with woodworm and decay. So….made
a new oak one, but thought I would include a quatrefoil for ventilation, which I later
covered with pierced aluminium mesh.

14a
With all the glass cleaned, I cut some new quarries from old glass, so that it is ready
for assembly with new lead came. Whilst I am at it, I did measure up for some very
small slit windows which are in the access turret. Currently, one has a pane of float
glass in and two more have a wood frame covered in decayed chicken wire, it won’t
take me long, so may as well make these three and I can finish it all off together, as I
loathe making up and using lead light cement, which is worked into the leaded panels in order to weather proof them and stiffen them up.

The slit windows will need a little frame, so I machine some simple frames from oak,
they are only very slim -about 6″ in width, so I just butt join them with glue and
mechanically fix them with brass screws. I added stop chamfers to the inside of the
frames just for a bit of detail. Luckily, they seem to fit in their new home, so just pointed them in lime with mortar of course.

15
When joining the mitres, I decided to use Repair Care, Dry Flex 4 hour, flexible
epoxy resin as my secondary fixing, used in conjunction with Repair Care, Dry Fix
stabiliser which is applied before the resin. I used stainless steel screws as my
primary fixing, which were screwed in from the back, about five screws in each
moulding section. It is my hope that this will stand the test of time, if the mitres do
open up, at least the end grain will be completely sealed with the stabiliser, to thwart
moisture ingress which had claimed the last moulding design.
16
I wanted to do something creative with the mitres, I had in my mind about flattening
off the mitres with an infill piece, possibly protruding into the spandrels to fill that
space. I thought I would cast some lead detail such as small Tudor roses, or just
domed buttons to place on the flat areas. Anyway, another time perhaps, but in the
end, I decided I would terminate the inner bead of the moulding into a protruding
18mm hardwood ball, as this would not be vulnerable as a moisture trap at the lower
part of the dial & when the rest of the frame is blue, I would gild these to accentuate
this tiny detail. After drilling a shallow hole & countersinking the bottom, I stuck
them in with Repair Care Dry Flex SF.

17
I thought I would do something else creative with the centre, rather than just drill a
hole for the shaft for the hands, I decided to do a quatrefoil & routed a V groove for
the vertical and horizontal registration lines. A bit bizarre & over the top for something
that isn’t seen, but I thought it would be fun & appropriately ecclesiastical.,
somebody will see it one day. After abrading everything with 80 grit, I then apply one
coat of low build stain to penetrate the timber and afford some first coat protection.
18
The old dial back boarding, it is completely shot, so am pleased I made the decision
to remove it. The old dial fixings, were through some rusty straps at the back, I do
not intend to re-use these as the primary fixing, although I will at least drill two
more holes and bolt it, to lock all the old and new together, thus leaving them there.
I then coated them up with ‘Owatrol’, to inhibit further corrosion. At the same time,
whilst it is accessible, I coated the back of the motion works board with Sadolin
quick drying preserver.

19
I used four stainless steel 6″ studs which are resin fixed to the stone wall. In
addition, to support the weight, I drove in two stainless steel spikes 300mm x 15mm
x 10mm thick at the lower angles of the octagonal board for extra security in
supporting the weight.
20
Hauling the dial up fourteen meters was no easy task, I rigged up a gantry gallows
bracket on the scaffold and used a block & tackle to half the weight. Luckily, I did not
have to do this on my own, helped by my brother, Richard Agnew and North Crawley
resident and friend of the church, John Plummer.
21
The juncture between the back of the clock dial boarding and the stone wall, was fairly
tight on one side, but on the other there was a gap of around 1″ -enough for small
birds to get in behind. Previously, this was taken up with mortar. When I took down
the old dial, it was very damp behind, so felt it would be better to maintain that air
gap, but stop moisture getting in. I used the existing lead flashing and dressed this
over the top and two angles. Then, I thought I would dress some lead down the
vertical sides, to seal this juncture. I used code 4 flashing and fixed it using copper
nails, after trimming to shape I then applied patination oil to improve its appearance.
The return flash was pointed using lime mortar for elasticity.

22

Bringing back into play the draft tracing taken earlier, now made into a working
drawing, I start to transfer the original layout using chalk. I used 20 hour gold size and
proceeded to gild the next day using extra thick pure 24 carat gold leaf. Conditions
were very windy and fairly cool, I managed to lose a couple of leaves and the size was
gluey to apply. I double gilded the hands and the faults the rest of the gilding, before
applying one last coat of Sadolin Superdec opaque satin finish -six in total and five
coats of Alkythane for the copper dish.
23
The oak infill piece with the quatrefoil vent mentioned earlier, I think this picture
explains its function more clearly. I left this finished in Sadolin Classic low build
‘Catalina grey’

BEFORE AND AFTER

BEFORE AND AFTER

The job is finished now, with the scaffold down, here are the overall pictures.

27

 

 

ST. FIRMIN'S CHURCH COMPLETED CLOCK DIAL RESTORATION

ST. FIRMIN’S CHURCH COMPLETED CLOCK DIAL RESTORATION